Olympic Park is located in northern axis of the city, located in the edge of the North Fourth Ring, North Star Bridge. A total area of 1135 hectares, is divided into three regions, north of 680 hectares of forest parks; the central area (B area), 291 hectares, is the main venues and related facilities built-up areas; the southern end of 114 hectares is already built stadiums area and set aside, the Chinese nation's parks are also included in the Olympic Park.
The Olympic Green, the Asian Games venues and the supporting facilities, convenient traffic, the population is concentrated, a good basic conditions for municipal, commercial, cultural and other supporting service facilities.
Olympic Park planning will focus on the city's long-term development and the public the need for material and cultural life, making a set of sports competitions, conferences, exhibitions, cultural entertainment and leisure shopping in one space open, green land surrounded by a beautiful environment, able to provide members of the public multi-service public activity center.
Central area of the Olympic Park in Beijing, North central axis endpoint, covers an area of 315 hectares, the city extended the traditional central axis, Yiyu continuation of Chinese history and culture of the millennium. Embodies the "science and technology, green, human," the three concepts is a blend of office, commercial, hotels, culture, sports, meetings, residential multi-functional new urban areas, the region has a comprehensive energy infrastructure, transportation network extending in all directions .
Olympic Green central area for hosting the Beijing 2008 Olympic Games, the main venue, have: Asia's largest urban area of artificial water system, Asia's largest urban greening landscape, the world's most open pedestrian plaza, Asia's longest underground traffic ring Lang. Beijing's new Olympic Group Co., Ltd. entrusted by the Beijing Municipal Government is now responsible for the Olympic central area of the Olympic Park construction project facilities, including underground construction of access road transport links, underground garage, underground space and sink gardens, axial paving, dragon-shaped water system, axis of the tree array, landscaping, planning a ~ 6 road, studio tower, Games-time parking lot, niangniangmiao green, tunneling channels in 12 projects.
The Olympic Park on behalf of the construction are:
1, National Stadium (Bird's Nest)
National Stadium, Olympic Park, one of the landmark building, which is located in the central area in the east axis, the dragon-shaped landscape water system of the west side. With the National Swimming Center, the National Stadium on both sides of a breakdown in the central axis.
National Stadium base covers an area of 78,000 ㎡, and comes with a 400-meter runway, a permanent warm-up venues with a total construction area of 260,000 ㎡, and permanent seating 80000 people, the temporary seating 20000 people, building an altitude of about 68 meters.
2, National Stadium
National Indoor Stadium in Beijing Olympic Park, one of the three major venues, located in the southern central area of the Olympic Park. Land use planning and construction of approximately 6.87 hectares, the main building close to the city axis, and with the National Stadium, relative to the axis of a balanced layout, construction area of about 80,000 ㎡, building an altitude of about 40 meters, is Beijing's largest, with international advanced level, multi-functional sports, fitness, recreation centers.
3, the National Swimming Center (Water Cube)
National Aquatics Center in Beijing Olympic Park in the central area of the south, land planning and construction of approximately 6.29 hectares with a total construction area of 80,000 ㎡, building height of 31 meters.
4, Convention Center
Convention and Exhibition Center is located in the Olympic Park, the central area of the central axis of the west of the city, plan construction land is about 12.2 hectares with a total construction scale of about 260,000 ㎡, building control height of 60 meters.
没有评论:
发表评论